Before I start my update for the week I want to let you know who our contractor is as I have had lots of questions and queries. We were recommended James who runs JA Whitney Building Contractors by the lovely Becki who lives nearby and whose husband is a structural engineer and has worked with James. We were looking for a contractor who would coordinate all of the different trades and plan the schedule of works so that we only had one point of contact and no extra hassle or stress in dealing with several different tradespeople. Maybe a bit further down the line I can write a whole post about how it all works out but so far it has been so easy and simple. James visited the site several times before he began, produced a detailed quote breaking down each job and its cost, a detailed weekly schedule of works so that we know what is happening and when, a weekly invoice for the works completed the week before and all we have had to do is choose and buy the radiators, paint, bathroom suite and tiles – he buys all the necessary materials and they are included in the quote. Jules meets James every Monday morning before work to go through how the previous week went and any details that need to be discussed for the upcoming week. James’s partner, Sian, is on hand via email to do all the admin behind the project – invoices, building controls and that sort of thing – and answer any questions. The team have been great so far so I’m keeping my fingers crossed that that continues!
We’re well into week three of the renovations now but week two saw the biggest difference that will be really noticeable for some time as the main walls were removed downstairs. We now have a completely open plan downstairs layout with a separate hallway leading upstairs. It’s very small but removing the wall between the kitchen and the dining room and the wall between the dining room and the from reception is the only layout that I felt would work for us. The steels have not gone in yet where the supporting wall has been removed and we have quite a bit of furniture and stuff waiting to be fitted in the bathroom piled up in the front reception so it’s not super easy to get an idea of the space but hopefully these snaps will give you an idea…
When we can afford to extend into the garden we will make more changes to the layout of the downstairs, like add a loo under the stairs and push the kitchen into the extension, but here is the floor plan as the property was when we bought it just to remind you…
This is how the room looks from the hallway now with the two doorways that will remain – so much better being able to see out into the garden and having all the extra light…
This is where the remaining kitchen is located and as I have said before we are making a big compromise by not fitting a new kitchen and making do with a teeny one until we can extend as there’s just no way we were going to prioritise funds there when we know we will rip it out in a couple of years to extend…
Here’s a closer look at what is left…
We have ordered a new inexpensive white laminate worktop from ManoMano because the black has got to go! The space is 2.7m so we will take the worktop to the end of the wall. My mum has an old ceramic sink in her garden and if we can clean it up well enough we will put that in too. I say ‘we’ but I actually mean Jules. We’ll figure out an inexpensive way of replacing the cabinet doors, the tiles have already been removed and I think we may put my String Shelving up either side of the cooker hood for now. There is a separate larder in the hallway just next to the kitchen door and James, our contractor, suggested we place an under counter fridge and freezer parallel with this wall with a wooden worktop – probably one of those cheap Ikea ones. I think that’s a really good idea as it will give us much needed worktop space as well as giving us somewhere to discreetly hide away fridge/freezer as the space is too small for a big one. I’ll keep you updated on this separate project for us!
So here is how the rest of the room looks…
The plasterboard has started to go up upstairs too…
I’ve got loads more to show you about the bathroom as this is where we are spending a fair bit as we know it will always stay as it is. That will be my next post!
Katy x
Looking fab Katy!!
So pleased its worked out well with James, pleased I could connect you two! & thanks for the name check for BookitBecki & my husband Dan
Xxx
Enjoy seeing your neat project! And just need to tell you…that lil girl of yours is the bee’s knee’s! 🙂
I will soon be renovating the apartment, I can already see how the whole house will be a mess for a month … I hope that everything will go my way and we will not have to correct anything: D To be honest I do not like renovating, but I like to admire the final effect : D I’m also waiting for the post how everything will look like at the end of you.
Hi Katy, I love what you’re doing with your house. Do you mind advising why you took down the old plaster and got the whole place re-plastered? I’ve just moved into a 1910 house and am trying to figure out keeping old walls and patch a few wonky bits or replastering. It’s just so expensive! I’d really appreciate your thoughts.
Thanks
S.
Looks great – we are about to undertake our project and do pretty much the same as you – our floorplans are exactly the same so its great to follow this project!
I assume you now have steel beams in place of the missing walls?
In your previous blog where you strip out the property, did you do this yourself or employ someone to do it? We are in the same boat as you, on a budget but with family commitments it might be too much to do on our own
Author
Oh wow! How cool that we have the same floor plan – hope following along helps you guys a bit in that case. Yes, we have a steel where we took the wall down between the two reception rooms but no steel was needed between the kitchen and back reception as it wasn’t a supporting wall.
We paid a small team to strip out the house because there had been a large leak and we needed to dry out the walls quickly. It cost just over £1000 for them to remove all the plaster throughout the house and dispose of it. Hope that helps!
Hi Katy … sooooo i love love love what you and your family have achieved ! We are in a position where we are considering moving to a 1930s home that has had absolutely nothing done to it … no gas mains, storage heaters , pull chain toilets, electric floor boiler😱😱😱 is it too cheeky to ask how your budget broke down as i’m interested what to prioritise first ( we would like to knock through dining room & kitchen too)
Author
Hi Trina. Send me an email and I can give you a better idea of our budget and what it got us katy@18.200.196.112 xx